Tomorrow

Apr18
2006
Written by admin

Tomorrow is the day. We’ve been waiting for over a year. Tomorrow we move the patients.

The construction isn’t done. As everybody already knows, we’ve been involved in a dispute with the construction company over the completion of this project. They basically abondoned it for a long while last year, during a time that we had more intense concerns than riding herd on languishing construction people. Unfortunately during that time, the construction company became over-extended and suffered serious critical personnel injury. Once we turned our attention back to that painfully-late project, it was too late to save it gracefully. Instead, it has been frustrating. (We’re still trying to finish, but it finally won’t be much longer.)

The liquid nitrogen plumbing isn’t quite done. We will not have automated fills of the dewars for at least a week after the patients move. We’ve been pulling our entire nitrogen supply off the bulk tank since it was filled last week, but we still haven’t pulled enough to replace the broken valve. Hugh, as the critical individual on this project, has decided his annual-and-only vacation at the Space Access conference is more important. We’ll have to fill the dewars manually (as they need it), and Hugh will be involved with all of them until the plumbing is complete.

If there is a critical juncture in this move, it’s in the fact that the plan involves using a crane to pick the dewars up and swing them around to the new space (lifting only a few inches off the ground). We know we can roll them and all the wheels are greased, so we just have to put them in reach of the crane. We’ll be testing the lifting lugs, and on some dewars that are more than a decade old. The patients are safely submerged in liquid nitrogen, but we’ve been boiling off the uppermost layers to reduce the weight of the units. That will reduce the load on the lugs somewhat.

We’ve never had any of these dewars fail (or fall) with patients inside; but like the delicate move from California, this move is fraught with the potential for disaster.

We believe it will be fine and that all will be well and the new space seem used after so long unfinished. But there’s that niggling doubt, that concern for defenseless things, furry or otherwise, that this could go horribly wrong.

We have tried to engineer this move for safety. Hiring professionals to do the heavy lifting, instead of rolling dewars by hand along the heavily sloped parking lot… that was for patient and staff safety. We have installed a new hoist, that will simplify the moving of patients, if a dewar should suffer a leak. We weren’t able to obtain a plasma cutter in time for the move, and that may become a time-sensitive issue if one of the dewars impacts. (We have cutting tools, of course, but they would take longer in extracting the patients than the beam would.) We do have a spare dewar and enough liquid nitrogen to fill it and the means to do so quickly.

We have also tried to engineer it for speed. We don’t want the bays to be split any longer than they have to, and we don’t want to have to do this two days in a row. The plan is good. The plan should work.

Posted in Patient Care
SHARE THIS Twitter Facebook Delicious StumbleUpon E-mail
« Betty Bulk Tank’s first fill
» Patients Moved Well

5 Trackbacks

  1. electrician melbourne on June 5, 2013 at 8:55 pm
  2. sicbo on June 5, 2013 at 9:03 pm
  3. Parkway on June 11, 2013 at 8:17 pm
  4. electrician melbourne on June 12, 2013 at 9:37 am
  5. mirena iud lawsuit on June 28, 2013 at 1:15 am

Recent Posts

  • 40 Scholarships Available to Teens & Twenties 5 2014
  • Resuscitation and Reintegration of Cryonics Patients Symposium in Portland Oregon
  • Bring in a new member and we will credit your membership dues
  • Alcor director Michael Seidl steps down
  • Alcor’s 117th Patient

RSS Cryonics Magazine

  • Cryonics March 2013
  • The Past, Present, and Future of Alcor Membership Dues
  • Reversible Cryonics
  • Cryonics February 2013
  • Does Aging Stop?
  • Consciousness, Natural Selection, and Knowledge
  • Cryonics January 2013
  • Alcor-40 Conference Review
  • Chemical Brain Preservation and Human Suspended Animation
  • Cryonics November-December 2012

Categories

  • Announcements
  • Cryobiology
  • Cryopreservations
  • Legal
  • Media
  • Membership
  • Nanotechnology
  • News & Events
  • Operations
  • Patient Care
  • Readiness & Deployment
  • Research & Development
  • Training

Archives

  • May 2013
  • April 2013
  • March 2013
  • January 2013
  • November 2012
  • October 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011
  • November 2011
  • October 2011
  • September 2011
  • August 2011
  • July 2011
  • June 2011
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • December 2010
  • November 2010
  • October 2010
  • September 2010
  • August 2010
  • July 2010
  • June 2010
  • May 2010
  • April 2010
  • March 2010
  • February 2010
  • January 2010
  • December 2009
  • November 2009
  • October 2009
  • September 2009
  • August 2009
  • July 2009
  • June 2009
  • May 2009
  • April 2009
  • March 2009
  • February 2009
  • January 2009
  • December 2008
  • November 2008
  • October 2008
  • September 2008
  • August 2008
  • July 2008
  • June 2008
  • May 2008
  • April 2008
  • March 2008
  • February 2008
  • January 2008
  • December 2007
  • November 2007
  • October 2007
  • September 2007
  • August 2007
  • July 2007
  • June 2007
  • May 2007
  • April 2007
  • March 2007
  • February 2007
  • January 2007
  • December 2006
  • November 2006
  • October 2006
  • September 2006
  • August 2006
  • July 2006
  • June 2006
  • May 2006
  • April 2006
  • March 2006

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org

EvoLve theme by Blogatize  •  Powered by WordPress Alcor News
News Blog of the Alcor Life Extension Foundation