Technical Updates

Research and Development
Our preparation of the new whole-body vitrification system is nearing the alpha testing phase. The patient enclosure has been tested periodically to ensure our design refinements are performing as expected. Changes include altering the configuration and flow of the nitrogen injectors, adding additional insulation, increasing the size of the plenum, and constructing a mounting platform for the circulating fans.

Readiness
Regina Pancake, Readiness Coordinator, attended the training session held by Cryonics Institute and one of our own in southern California. The focus of the southern California training was a review of changes we have been making to the medications kit. We have settled on a new design that pre-packages everything needed to prepare the medications for administration, and this design was well-received by the southern California team. It is simpler and clearer for the team members, and the few modifications suggested by the team are being implemented.

As part of the recovery process, we have been building new medication kits for the regions. We will soon be replacing all of the med kits in the regions with fresh medications and with the new packaging.