Progress continues on the whole-body system. An outside contractor cut the custom chiller panel for heat exchange controls; and Hugh Hixon completed the wiring necessary for that part of the system. Programming continues.

Our equipment fabricator is currently building the new version of our liquid ventilation system, with all the modifications that came out of the previous round of testing done quite some time ago.

Different pumps are required for this version, and the heat exchange coils were fabricated locally for improved cooling.